UPDATE:
The Pearl is anchored in the staging area to transit the canal and we are
scheduled to be in the Gatun lock at 9-1000 pm Washington DC time tonight,
Thursday Mar. 20th and will be transiting through the various locks
finishing on the Pacific side about 330am Friday Mar. 21st.
This is the Panama Canal Authority Web cam to watch the Pearl go through the
different locks:
http://www.pancanal.com/eng/photo/camera-java.html
This is a kick!
Tina, Braun, Jose, Wayne, Steve?
Aboard the Nordhavn 62 Grey Pearl
Well one side of the locks is now vacant and refilling. Other side still has
container ship in the lock.
Ron Rogers
There is something at the end of the right-hand lock. This time-lapse
photography is mostly lapse. Ron Rogers
I think that the system has malfunctioned/ There has not been a change in
the last half hour and "the last 20 images" leaves a big gap. We may miss
her passage at these locks. Ron Rogers