Any questions?
Today, I worked on some wiring, LED courtesy lights going down the steps into the starboard guest stateroom. Then a couple of outlets in the galley.
After lunch I started to install the 200 GPD Spectra watermaker.
I am going to have to reconfigure the solar hookup on the water heater to make more space for the Clark pump on the watermaker.
As an old friend of mine said once, " boatbuilding is a game of inches."
We have tried to make all the systems easy to service, laid them out in such a way as to make them work well and have room to service them.
On the steering and fuel system we used copper tubing with a plastic jacket on it, normally used for propane, as with some tubing, flare nuts and some unions, plus a flaring tool and tubing cutter, you can repair it anywhere, unlike high pressure hose.
There are 7 built in tanks, 4 fuel, 2 water, 1 holding.
All except the holding tank have cleanout plates.
Counter tops are going in, lighting is nearly complete, and we are beginning the flying bridge.
It should be a very comfortable boat to travel in.