Activities last week:
Fixed bustage, no uplifts, no release activities, looked for and fixed regressions, 18 reviews, misc. bug fixes, sheriffing. List below. Notable:
Obstacles and impediments:
Slow reviews as noted below, six and three weeks delay so far.
General remarks:
C-C tree status: Deteriorating (details below), currently no build/release support, no manpower to investigate various intermittent test failures.
Current known threats from M-C: Dev tools become system add-on.
Jörg.
Tree status classification: Green, Normal (some failures), Deteriorating (many failures, opt builds still green), Critical (opt builds with failures), Blocked, Doomed:
Currently we have no test coverage on Linux and Mac tests fail at random about half the time as shown due to misconfiguration of servers:
Landed:
Prepared patches now awaiting review:
=== Dates (7) ===
Tu 29 Aug 2017: 4.05 hours
Mo 28 Aug 2017: 3.52 hours
Su 27 Aug 2017: 8.65 hours
Sa 26 Aug 2017: 7.22 hours
Fr 25 Aug 2017: 11.03 hours
Th 24 Aug 2017: 4.00 hours
We 23 Aug 2017: 8.98 hours
=== Activities ===
Administration 73 min, 1.22 hours ( 2.6%)
Bustage fixes 473 min, 7.88 hours (16.6%)
BMO follow-up 268 min, 4.47 hours ( 9.4%)
Other bug fixes 596 min, 9.93 hours (20.9%)
Volunteer Triaging 86 min, 1.43 hours ( 3.0%)
Regression Triaging 45 min, 0.75 hours ( 1.6%)
Sheriffing 299 min, 4.98 hours (10.5%)
Bugfixes for Regressions 30 min, 0.50 hours ( 1.1%)
Reviews 219 min, 3.65 hours ( 7.7%)
Technical Debt (nsIAtom) 758 min, 12.63 hours (26.6%)
=== Totals ===
2847 min, 47.45 hours, 6.78 hours per day on seven days per week